#255b: Gravel applied
Andrea and I spent a rainy afternoon moving the stones. I turns out that 2 yards is quite a bit of stone (it was the minimum for delivery).
Anyway, here is the result:
The side yard in front the fence also doesn’t drain well, so we pretty much tore it up like a cyclocross race in the wet.
Even after changing the job scope to include a 3′ wide strip down to the bottom of the yard, we still ended up with 1/2 to 3/4 yard remaining. We consolidated it and decided to wait until it dries up before moving the rest somewhere? Other side yard? Maybe the side yard in front of the fence (muddy part shown above)?







quick project to finally trim out the 2 yards of stone project is installing the loose landscape timbers that have more or less kept the stone and lawn apart.